Begin Main Content Area

Project Showcase

The Bureau of Capital Projects Construction coordinates and oversees the construction of all non-highway construction projects for the Commonwealth through four Regional Offices: WesternNorth Central, South Central, and Eastern. This includes new construction and all types of alterations and renovations to existing Commonwealth properties.

The photos exhibited in the showcase is an example of some of the projects in construction, or recently completed, by the Capital Projects Construction Division.

Region Map showcasing the different office locations for the Bureau of Capital Projects.

Western​
North Central​
South Central
Eastern
​Float Counties*

*Staff assigned from any adjacent region based on regional workload.

​Western Region Projects 

A portable generator and bulldozer sit on a dirt covered hill.
Circular concrete mounds adorn the ground.
A pickup truck sits in the distance, with a concrete barrier near the front.
199-84
Dam A and Dam B Upgrades
Silk Boils Tamarack Lake 

PC: Hamby
APC: Kaliszewski

199-84
Dam A and Dam B Upgrades
Silk Boils Tamarack Lake 

PC: Hamby
APC: Kaliszewski

199-84
Dam A and Dam B Upgrades
Silk Boils Tamarack Lake 

PC: Hamby
APC: Kaliszewski

A front view of the damn with concrete walls and a center channel area.
A shower house sits behind a newly finished parking lot.
An excavator moves ground in a detention pond.
199-84
Dam A and Dam B Upgrades
Silk Boils Tamarack Lake 

PC: Hamby
APC: Kaliszewski

166-36
Beach Shower Houses 
Presque Isle State Park  

PC: Genovesi
 APC: Kaliszewski

251-57
PennDOT Somerset County 
Stockpile Facility Detention Pond 

PC: Ponczek
APC: Appley

Grass surronds a new detention pond.
A large garage with an open door area.
A brown wall with pipes stands tall amid the construction waste.
251-57
PennDOT Somerset County 
Stockpile Facility Detention Pond 

PC: Ponczek
APC: Appley

251-57
PennDOT Somerset County 
Stockpile Facility Detention Pond 

PC: Ponczek
APC: Appley

513-33
Upgrade Coal Fired Boilers
Torrance State Hospital

PC: Appley
APC: 
Bryan; Sergent

Three workers center a large boiler on a concrete pad.
A concrete sidewalk leads past two trees to a large red brick building with over 20 windows.
Drywall and metal studs are exposed in the early construction.
513-33
Upgrade Coal Fired Boilers 
Torrance State Hospital

PC: Appley
APC: 
Bryan; Sergent

402-62
Coover Hall Renovation at California
University of Pennsylvania
PC: Veyo
APC: Drury

413-51
Performing Arts Center at
Slippery Rock University
PC: Genovesi
 APC: 
Schuhlen

A high ceiling covered in drywall.
An exposed elevator shaft made of cinder blocks.
The interior of a theater without any seats.
413-51
Performing Arts Center at
Slippery Rock University
PC Genovesi
APC: Schuhlen

413-51
Performing Arts Center at
Slippery Rock University
PC: Genovesi
APC:  Schuhlen

413-51
Performing Arts Center at
Slippery Rock University
PC: Genovesi
 APC: Schuhlen

A building sits behind a grassy area.
The building's basement and rebar are exposed.
Three workers build a block wall.
210-05
New PA State Police
Headquarters in Greensburg
PC: Veyo
APC: Drury; Prokopovitch
210-05
New PA State Police 
Headquarters in Greensburg
PC: Veyo
APC: Drury; Prokopovitch

210-05
New PA State Police 
Headquarters in Greensburg
PC: Veyo
APC: Drury; Prokopovitch

An excavator moves rocks near a dam.
Concrete walls and flooring are used in this dam renovation.
A stream of water flows down a grassy area.
199-41
Donegal Lake Dam Renovations
PC: Ponczek
APC Sergent; Bryan

199-41
Donegal Lake Dam Renovations
PC: Ponczek
APC Sergent; Bryan

199-41
Donegal Lake Dam Renovations
PC: Ponczek
APC Sergent; Bryan

North Central Region Projects 
Workers lay block on a dam bed.
A turtle navigates the new dam.
Workers apply a finising material to the dam.
199-40
Kyle Lake Dam Renovations
PC: Kerlin
199-40
Kyle Lake Dam Renovations
PC: Kerlin

199-40
Kyle Lake Dam Renovations
PC: Kerlin
A pillar rises from the ground.
A damaged section of the dam awaits repairs.
A stream runs between two grassy hills.
196-11
Gunter Valley Dam
PC: Imperioli
APC: B. Boden

196-11
Gunter Valley Dam
PC: Imperioli
APC: B. Boden

196-11
Gunter Valley Dam
PC: Imperioli
APC: B. Boden
The water flows down a stones near theGunter Valley Dam.
A flat rubber roof and tall wall.
Bright yellow pipe sits atop the roof.
196-11
Gunter Valley Dam
PC: 
Imperioli
APC: B. Boden

1580-3
Quehanna Motivational 
Boot Camp Roof Replacement
PC: Sklarsky
APC: Hemphill

1580-3
Quehanna Motivational 
Boot Camp Roof Replacement
PC: Sklarsky
APC: Hemphill

The roof is in front of a tree area.
Three checkered red and white water silos rise up into the blue sky.
A large truck holds a crane near a water treatement plant building.
1580-3
Quehanna Motivational 
Boot Camp Roof Replacement
PC: Sklarsky 
APC: Hemphill

553-34
Water Treatment Plan
Replacement 
Selinsgrove Center 
PC: Eddinger 
APC: Hodgson; Rotz

553-34
Water Treatment Plan
Replacement 
Selinsgrove Center 
PC: Eddinger 
APC: Hodgson; Rotz

A sidewalk with piping coming through it.
HVAC and electrical units come out of the sidewalk.
Three HVAC units sit near a yellow and brown building.
594-2
HVAC Installation 
Trough Creek State Park
PC: Sklarsky
APC: Rotz

594-2
HVAC Installation 
Trough Creek State Park
PC: Sklarsky
APC: Rotz

594-2
HVAC Installation 
Trough Creek State Park
PC: Sklarsky
APC: Rotz

A wood and stone covered building sits in front of some evergreen trees.
191-45
Cooks Forest State Park 
Visitor Center
PC: Kerlin


South Central Region Projects 
The York Readiness Center sits behind parking spaces.
A sidewalk leads to the rear of the center.
A roadway runs infront of the buillding.
961-12
York County Readiness Center
New Maintenance Facility
PC: Sariano
APC: Singer

961-12
York County Readiness Center
New Maintenance Facility
PC: Sariano
APC: Singer

961-12 
York County Readiness Center
New Maintenance Facility
PC: Sariano
APC: Singer

An exposed escalator from the bottom looking up.
An exposed escalator at the State Museum looking down.
A finished view of the escalator looking down.
946-12
State Museum 
Escalator Installation
PC: Bamberger
APC: Singer

946-12
State Museum 
Escalator Installation
BPC: Bamberger
APC: Singer

946-12
State Museum 
Escalator Installation
PC: Bamberger
APC: Singer

A finished view of the escalator looking up.
Exposed rebar and broken concrete require repairs in the Main Capitol Parking Garage.
Green boxes contain the electrical distribution system at Shippensburg University.
946-12
State Museum 
Escalator Installation
PC: Bamberger
APC: Singer

948-81
Main Capitol Parking Garage 
Column Repair
PC: Hess
APC: M. Boden

412-55 
Renovation of Electrical Distribution System at Shippensburg University
PC: Bamberger
APC: B. Boden


Eastern Region Projects 
Aerial view of the Northeast Regional Office Building for the Game Commission.
Workers create a path for the concrete to flow out of the mixer.
Water flows along Breech Mill Dam's rocks.
200-53
Northeast Regional Office Building
Game Commission
PC: Flaim
APC: Tycenski

199-35
Minsi Lake Dam Repairs & Spillway 
PC: Polzer
APC: Bannar

515-29
Breech Mill Dam Wernersville
PC: Shultz 
APC: Plesnarski​

A grassy hillside near the dam.
Exterior photo of a new PennDot maintentance facility and its parking lot.
A loading dock with tall garage doors.
515-29
Breech Mill Dam Wernersville
PC: Shultz
APC: Plesnarski​


251-38
Construction of a Maintenance Facility for PennDot in Bucks County
PC: Polzer
APC: Davion

251-38
Construction of a Maintenance
Facility for 
PennDot in Bucks County

PC: Polzer
APC: Davion

Early into the work on the PennDot facility construction, the basement is being built with a bulldozer nearby.
Blue exterior walls are shown for this new building.
Steel is used to frame the Waller Admin building.
251-38
Construction of a Maintenance Facility for PennDot in Bucks County
PC: Polzer
APC: Davion

401-61
Waller Admin Building 
at Bloomsburg University 
PC: Flaim 
APC: Tycenski; Ditchey

401-61

Waller Admin Building 
at Bloomsburg University 
PC: Flaim 
APC: Tycenski; Ditchey

A  truck sits in front of a crane and the building under construction.
The exterior of the Waller Admin Building is under construction.
PennDot renovation and expansion takes place in Dunmore.
401-61
Waller Admin Building at Bloomsburg University 
PC: Flaim 
APC: Tycenski; Ditchey

401-61
Waller Admin Building at Bloomsburg University 
PC: Flaim 
APC: Tycenski; Ditchey

251-64
PennDOT District 4-0  Renovation
& Expansion in Dunmore

PC: Jackson
APC: Danchak

Concrete supports rise out of the ground.
An excavator moves debris in front of the building.
Workers review plans near the new garage.
251-42
Construction of New Garage
for PennDOT in Pike County  
PC: Jackson
APC: Valanda

251-42
Construction of New Garage 
for PennDOT in Pike County  
PC: Jackson
APC: Valanda

251-42
Construction of New Garage 
for PennDOT in Pike County  
PC: Jackson
APC: Valanda

Heavy machinery helps the construction of a new PennDot garage.
A crane holds a support beam in place.

251-42
Construction of New Garage 
for PennDOT in Pike County  
PC: Jackson 
APC: Valanda

251-42
Construction of New Garage 
for PennDOT in Pike County  
PC: Jackson
APC: Valanda